Critical Path analysis

Feb 11, 2008 2 Replies
Jump to replies (2)

Hi



I finally have successfully sythesised my design, unfortunately the critical path seems to be quite long so that i have a low frequency. Can anybody tell me whats the best way to identify the critical path? I used the Xilinx toolsuite, and there is a timing analyser so probably this one is the best bet?


Not necessary that the critical path is long a possibility is wrong relative position of clock buffer and clock pin. Timing analyser in ISE is the easiest to use, so you can start with that.