>> Assuming a nominal 240VAC supply, 245V is in no way "not correct" -- it's
only
> about a 2% overvoltage.
>
>And since there is likely no load in shop when the install was taking
>place, the 245 would be a higher than normal reading.
You're nuts. Maybe at the end of a 100 yard long run. Maybe.
There is no reason, however, for the entire feed to a building to sag that far between loaded and unloaded.