Hi,



I am using ISE5.1i...XST synthesis tool.



At the end of synthesis, XST generates defualt timing report for 1 or



2 paths.

How can i generate a timing report after synthesis for more than 100 paths?



ie., as like .twr after Place and route.



And How can i measure the time dealy between 2 specific points... Points could be FF,mux or any logic



Thanks in advance.



Regards, Muthu


Its all in the options.

Right Click "Post-PAR Static Timing" and choose your report options.

For analyzing specific paths - launch the "Timing Analyzer".

Its much better in 6.1!

Post PAR can only be run with the Map results Right. But i need to take the report from XST itself?

XST only does a summary. You will have to run map and trce to get 100+ paths.