Find and fix critical paths in gate level netlist by GOF

Feb 18, 2006 0 Replies

GOF, Gates On the Fly, GUI tool to do netlist trace and modification(ECO). New Release of GOF V2.097 with features



  1. Integrate a parser for Synopsys Primetime Timing Report file.
  2. Detect bottlenecks from timing report file.
  3. Import related violated paths into Partial Schematic.
  4. Visually isolating bottleneck on the schematic.
  5. Users can control to draw schematic of violated paths by defining Start-Point, Through-Point and End-Point.
  6. Wild card support to match Start/Through/End points.
  7. Interactive with build-in ECO engine to fix the violated paths. Check Timing ECO example
    formatting link
    Nandy
    formatting link
    Netlist Debug/ECO in GUI mode.

Join the Discussion

Have something to add? Share your thoughts — no account required.

Didn't find your answer?

Ask the community — no account required