Great minds think alike. I'm running a simulation right this minute (?) that uses delay lines to create the differences. Maybe in Excel just stagger the column staring points to get deltas as a function of time, the "cherry pick" :-)
(?) 10 minutes or so, and I'll post.
...Jim Thompson
| James E.Thompson, CTO | mens |
| Analog Innovations, Inc. | et |
| Analog/Mixed-Signal ASIC's and Discrete Systems | manus |
| Phoenix, Arizona 85048 Skype: Contacts Only | |
| Voice:(480)460-2350 Fax: Available upon request | Brass Rat |
| E-mail Icon at http://www.analog-innovations.com | 1962 |
Spice is like a sports car...
Performance only as good as the person behind the wheel.
Didn't find your answer? Ask the community — no account required.
J
Jim Thompson
Doesn't tell me a lot... more thought required :-( ...Jim Thompson
| James E.Thompson, CTO | mens |
| Analog Innovations, Inc. | et |
| Analog/Mixed-Signal ASIC's and Discrete Systems | manus |
| Phoenix, Arizona 85048 Skype: Contacts Only | |
| Voice:(480)460-2350 Fax: Available upon request | Brass Rat |
| E-mail Icon at http://www.analog-innovations.com | 1962 |
Spice is like a sports car...
Performance only as good as the person behind the wheel.
J
Jim Thompson
Pondering... can you do an A-to-D in Excel? ...Jim Thompson
| James E.Thompson, CTO | mens |
| Analog Innovations, Inc. | et |
| Analog/Mixed-Signal ASIC's and Discrete Systems | manus |
| Phoenix, Arizona 85048 Skype: Contacts Only | |
| Voice:(480)460-2350 Fax: Available upon request | Brass Rat |
| E-mail Icon at http://www.analog-innovations.com | 1962 |
Spice is like a sports car...
Performance only as good as the person behind the wheel.
R
Robert Baer
The data is already digital...discrete samples to be more accurate. However, if you "merge" the three "incoming" channels (columns), and make/create/calculate sample times for each point, then the result will be a jittery sampling of the overall incoming waveform (the D part of the A-D) if i interpret your initial query correctly. X-Y scatter plot that and let Excel "draw" its "approximation" or "average" curve. You might even be able to get Excel to figure and show the error bands for grins. Do not know if one then can "sample" that "average" curve at regular intervals or not. But, all data points can drop into a Fourier transform (courtesy of VB) and that should show the main components with the "fuzz" or error bands being "in the mud" so to speak. Do a dB snip and an inverse Fourier on the results for a cleaned waveform?
J
Jim Thompson
Your point-by-point (aka connect-the-dots :-) works pretty good.
Digging thru all the various stuff I've saved from here, I came across a 2-year-old post by "The Phantom" suggesting...
(1) Take derivative (easy enough to do with almost any Spice) (2) Make a step approximation to that (3) The step break-points are the break-points from which to collect data.
General question, can (2) be even steps, or is there a more subtle way to fit?
Is the "The Phantom" still in residence? ...Jim Thompson
| James E.Thompson, CTO | mens |
| Analog Innovations, Inc. | et |
| Analog/Mixed-Signal ASIC's and Discrete Systems | manus |
| Phoenix, Arizona 85048 Skype: Contacts Only | |
| Voice:(480)460-2350 Fax: Available upon request | Brass Rat |
| E-mail Icon at http://www.analog-innovations.com | 1962 |
Spice is like a sports car...
Performance only as good as the person behind the wheel.
J
Jim Thompson
The derivative method seems to work pretty good.
One failing in my PSpice "tool" is that I'm watching only the LSB of my ideal A-to-D.
Any ideas on how to watch 6-bits (broadside) for _any_ change. ...Jim Thompson
| James E.Thompson, CTO | mens |
| Analog Innovations, Inc. | et |
| Analog/Mixed-Signal ASIC's and Discrete Systems | manus |
| Phoenix, Arizona 85048 Skype: Contacts Only | |
| Voice:(480)460-2350 Fax: Available upon request | Brass Rat |
| E-mail Icon at http://www.analog-innovations.com | 1962 |
Spice is like a sports car...
Performance only as good as the person behind the wheel.
U
Uwe Hercksen
Jim Thompson schrieb:
Hello,
I would use a software which can handle the 1000 data points in each data column.
Not every data set can be reduced from 1000 to 100 data points with loosing significant information.
Bye
G
Grant
Did Jim publish the numbers? Can't remember.
Grant.
J
Jim Thompson
Aha! A Non-solution. I can't choose the end-use software. It was developed by an IEEE committee... need I say more :-) ...Jim Thompson
| James E.Thompson, CTO | mens |
| Analog Innovations, Inc. | et |
| Analog/Mixed-Signal ASIC's and Discrete Systems | manus |
| Phoenix, Arizona 85048 Skype: Contacts Only | |
| Voice:(480)460-2350 Fax: Available upon request | Brass Rat |
| E-mail Icon at http://www.analog-innovations.com | 1962 |
Spice is like a sports car...
Performance only as good as the person behind the wheel.
M
Michael A. Terrell
Idealized Expectations of Electrical Engineers? ;-)
| James E.Thompson, CTO | mens |
| Analog Innovations, Inc. | et |
| Analog/Mixed-Signal ASIC's and Discrete Systems | manus |
| Phoenix, Arizona 85048 Skype: Contacts Only | |
| Voice:(480)460-2350 Fax: Available upon request | Brass Rat |
| E-mail Icon at http://www.analog-innovations.com | 1962 |
Spice is like a sports car...
Performance only as good as the person behind the wheel.
M
Michael A. Terrell
That explains Sloman's IEEE E-mail address. :)
Join the Discussion
Have something to add? Share your thoughts — no account required.
Didn't find your answer?
Ask the community — no account required
Report Content
You are reporting this content to the moderators. They will look at it
ASAP.