Solar and battery buffered fast charger on a small rural grid feed

Nov 21, 2026 Last reply: 1 hour ago 4 Replies
Jump to replies (4)

Most rural charging projects start from the grid side: apply for a big feed, wait, and hope. The maker took the opposite route at the farm in Vörå, Finland, starting from a small and affordable connection and planning to reach a 400 kW peak by buffering that limited grid power with stationary battery storage, paired with an expanded solar array. The maker says a direct 700 A utility connection was prohibitively expensive and would have taken over five years; in my view that makes the buffered route the only realistic path.



The site so far has an exterior electrical cabinet with metering and breakers, two wall-mounted 22 kW AC chargers, and rooftop photovoltaic panels on two red wooden buildings. While the permanent hardware is still to come, a portable Kempower T-Series mobile DC charger is serving the site. Getting even the modest connection took a year and a half and cost around €6,500, which gives a sense of how slow rural grid work can be.



Testing has already happened with a Volvo EV, charging at 40 kW, measured as 63 A at 400 V, and the Kempower unit supports both CCS2 and CHAdeMO at that rate.



The big unfinished piece is the peak output itself: the 400 kW figure is an intention, not a delivered result. The stages ahead include civil groundworks, underground DC cabling, concrete foundations and the Kempower Satellite dispenser installations. How the stationary storage will be sized to actually hit that peak is still an open question.



Project by Dala's EV Repair. Watch it on their YouTube channel:

formatting link


Going with battery buffering instead of chasing a bigger utility feed seems like the smart call to me. The maker says a direct 700 A connection was too expensive and more than five years away, so waiting that long would have stalled everything. Paying around €6,500 and waiting a year and a half for a modest feed, then boosting it with storage and solar, looks like a sensible path for a rural site.

Has the maker said how the stationary battery storage will be sized to reach the 400 kW peak, and whether the expanded solar array feeds into that same buffer or works alongside it separately?

The maker has not said how the storage will be sized. What is known is the plan: limited grid power buffered by stationary batteries, paired with an expanded solar array, is meant to deliver the 400 kW peak. Right now the charger is delivering 40 kW to a Volvo EV, measured as 63 A at 400 V.

One concrete suggestion for the coming stages: photograph and label every run of the underground DC cabling before the civil groundworks are backfilled. Buried cables are the hardest thing to trace later, and with concrete foundations going in on top, a simple route map would make any future fault-finding at the site far easier.