al report

Jun 17, 2025 Last reply: 9 months ago 51 Replies
formatting link

*Spanish minister rules out cyber-attack as cause of April blackout, after expert report*

System failure caused by network’s inability to control grid voltage said to be behind outage in Spain and Portugal


The unprecedented blackout that brought the Iberian peninsula to a standstill at the end of April was caused by surging voltages triggering “a chain reaction of disconnections” that shut down the power network, an expert report commissioned by the Spanish government has found.



Speaking to reporters on Tuesday afternoon, the country’s environment minister, Sara Aagesen, ruled out a cyber-attack as the cause of the outage on 28 April, saying it had been down to a “multifactorial” system failure caused by the network’s inability to control grid voltage.


(read the rest on the link if desired, it is in English)


formatting link

*Spain's government blames huge blackout on grid regulator and private firms* 3 hours ago Guy Hedgecoe BBC News in Madrid

The Spanish government has said that the national grid operator and private power generation companies were to blame for an energy blackout that caused widespread chaos in Spain and Portugal earlier this year.



...



Nearly two months after the unprecedented outage, the minister for ecological transition, Sara Aagesen, has presented a report on its causes.



She said the partly state-owned grid operator, Red Eléctrica, had miscalculated the power capacity needs for that day, explaining that the "system did not have enough dynamic voltage capacity".



The regulator should have switched on another thermal plant, she said, but "they made their calculations and decided that it was not necessary".



Aagesen also blamed private generators for failing to regulate the grid's voltage shortly before the blackout happened.



"Generation firms which were supposed to control voltage and which, in addition, were paid to do just that did not absorb all the voltage they were supposed to when tension was high," she said, without naming any of the companies responsible.


(read the rest on the link if desired, it is in English)


formatting link

Translated article (by DeepL)



*The blackout report detects power plants that ‘were not regulating voltage’ and an ‘undue’ disconnection of installations.*


The historic energy blackout was due to ‘a combination of factors’: there were plants “available” to regulate voltage that were not doing so ‘according to the regulations’ and there were plants that were disconnected ‘improperly’, according to Aagesen - The government gives an ultimatum to the electricity sector due to its delays in providing data on the blackout.



Antonio M. Vélez 17 June 2025 13:58 h Updated 17/06/2025 17:02 h 14-18 minutes



A phenomenon of ‘overvoltages’ and a ‘chain reaction’ caused by ‘a combination of factors’ of several agents in the sector, with a plant that is not available and Red Eléctrica (REE) does not decide to replace it; generation plants that ‘were not regulating voltage’ as required by the regulations and an ‘improper’ disconnection of facilities. These are the causes of the historic blackout on 28 April, as explained this Tuesday by the Third Vice-President and Minister for Ecological Transition, Sara Aagesen.



At a press conference after presenting the report drawn up by the committee investigating the very serious energy blackout, approved this morning by the National Security Council, Aagesen explained that one of the causes of the blackout is that the system ‘did not have sufficient voltage control capacity’.



The thermal generation groups that had to do so, ‘many of them’ paid financially, ‘did not contribute’ to doing so because the plants ‘were not programmed’ properly. It should be remembered that for at least five years the National Commission for Markets and Competition (CNMC) has been planning to approve a regulation to regulate this issue. The current one is ‘obsolete’, as the regulator itself has acknowledged.



Aagesen insisted that ‘there are several causes’ of the blackout. One of them is ‘poor voltage regulation capacity’, due to ‘poor planning’ or because ‘some operators’ were not complying with the regulations.



The result of this deficient voltage control is that this parameter ‘did not stop rising’ that morning and the disconnections of plants began. Also the ‘smaller’ ones, which the system operator, REE, ‘cannot see because they are in the distribution network’. After a first disconnection in Granada and those already known in Badajoz and Seville, there are more disconnections that had not been revealed until now in Segovia, Huelva and Cáceres.



According to Aagesen, ‘some of these disconnections occurred improperly’, i.e. before reaching the overvoltage levels allowed by the regulations, and other disconnections occurred ‘within the authorised limits to protect the installations’. And from there to a massive ‘blackout’ within five seconds, with a ‘chain reaction’ against which there was ‘nothing to be done’.



In the first phase of voltage instability, on the eve of the blackout, REE asked 10 power plants ‘spread throughout the territory’ that were not matched by the market to enter the so-called system of technical restrictions in order to control the voltage. But that Sunday afternoon, one of the planned plants was declared ‘unavailable’.



Faced with this change, the system operator has to ‘readjust’ and decides to ‘reschedule but not replace’ that plant: it only does so at dawn. The report does not identify this plant because it is ‘anonymised’ at the express request of the companies, according to sources from Transición Ecológica.



The Vice-President called for ‘reflection’ by ‘all the agents’ in the electricity system but did not want to point out responsibilities, which is something that will occur in ‘the next phase’: it will be ‘the administrative and judicial procedures’ that will have to establish them, in reference to the decisions that the CNMC may take and the proceedings that are already underway in the National Court.



On the day of the blackout, from 10.30 a.m. onwards, voltage instability intensified, although ‘within the limits’ set by the regulations, with various calls from the control centres. At 12:03 a.m. an ‘atypical’ oscillation arrived, with a higher than normal frequency.



The system operator links it to ‘a specific installation and its anomalous behaviour’; it takes “effective” measures to dampen it but the ‘meshing of the grids’ and the low demand contribute to ‘an increase in voltage’; it also reduces the export of energy to France, which means that generation in Spain falls and voltage rises.



At 12.16 this oscillation reappears and ‘dampens again’. Another oscillation occurs at 12.19 which is absorbed and the result is a negative effect ‘on system voltage’. It is decided to connect a power plant in the southern zone but it will take ‘an hour and a half’ to connect. And the disconnections of plants begin.



Aagesen announced that the next Council of Ministers will approve a Royal Decree-Law with a package of measures to ensure that the incident ‘does not happen again’. It will ‘accelerate the implementation’ of the National Energy Commission (CNE) announced more than a year ago; the ‘supervision and verification’ of system agents will be strengthened, storage will be promoted and the CNMC will approve these regulations to allow renewables to control voltage, as requested by REE in 2021.



Aagesen explained that in the analysis of the operation of the system, more than 100 requests for information were made, with more than



700 requests and millions of data in 170 GB of information.

The report includes a first phase of voltage instabilities, also in the ‘days prior’ to the blackout, a second phase of system oscillations (in the half hour prior to the outage), another of generation losses, and the subsequent collapse of the electricity system. A ‘complex, delicate’ analysis with “contradictory” data and ‘information that in the end has not arrived’. These ‘omissions’ have been ‘made explicit in the report’ that will be published this afternoon.



From the point of view of cybersecurity, it has been concluded that ‘there is no evidence of cyber-incident or cyber-attack as a cause of the energy crisis, neither in the operator nor at the different levels’.



However, ‘vulnerabilities’ and ‘shortcomings’ have been identified in the systems in the face of potential risks that will be “exploited” to issue recommendations for the future, following ‘the largest investigation into cybersecurity that has ever taken place in our country’, with more than 1600 hours of work, more than a thousand IP, more than 133 GB and fourteen operators analysed: from the system operator to the more than 30 control centres of the distributors throughout the country; and a third level ‘of detail’ of the generation facilities.



Some conclusions will be brought to the attention of the CNMC: those issues that should be brought to the CNMC's attention. The report, due to a ‘confidentiality obligation’ has “anonymised” information, ‘on most occasions’ at the request of the actors involved. Aagesen is due to appear before the Official Secrets Committee this week.



The report has been presented 49 days after the blackout, ‘practically half the time Europe gives to present its report to the EU’ and much earlier than expected.



Aagesen had promised that the document would be ready within three months of the incident, but in recent days (in parallel to the explosion of the scandal of alleged corruption of Santos Cerdán, now ex-Secretary of Organisation of the PSOE) the meetings of the inter-ministerial committee investigating the outage have accelerated. The last meetings were held last Friday, Sunday and Monday.



In total, this body chaired by Aagesen and made up of ‘state professionals of recognised prestige’ was created on 30 April. It is made up of several ministries and has held 14 meetings since this historic Iberian zero, which has provoked cross accusations between the electricity companies (particularly Iberdrola) and the system operator, against the backdrop of the multi-million dollar compensation at stake.



On 4 June, the committee went so far as to write to the electricity companies to express its ‘concern’ about the slowness in sending certain information, which led aelec, which includes Iberdrola and Endesa, to state that it is ‘absolutely false’ that they were ‘hiding information’ about the blackout, although these two companies acknowledged that they had some requests for data pending to be answered.



The committee is made up of several ministries, in addition to Ecological Transition (Economy, Defence, Interior...) and organisations such as the National Cryptologic Centre and the Defence Staff. The Nuclear Safety Council (CSN) and the CNMC, which will also draw up its own report, will be ‘invited’. In addition to this document, as required by EU regulations, the European transmission operators' association ENTSO-e, of which REE is a member, will draw up its own report.


Translated with DeepL.com (free version)



[...]
[...]
[...]

The usual nonsense we have come to expect from 'factual' reports. Ignorant minister? Ignorant reporter? ...or both.

Does Spain not have any load dumps of last resort for grid balancing?

Typically industrial processes that can absorb large amounts of energy at short notice. Electrolytic chloralkali production, aluminium smelting and other arc furnaces being the UK's load dumps of last resort.

It is crazy to have lost control for an *over* voltage failure condition

- particularly at noon when predictably the sun is at its highest and solar PV output will be maximised. Non-renewable suppliers should have been throttled back to keep the thing stable. Why did that not happen?

You will always have a few sites that trip out prematurely if the line voltage starts thrashing around. In an ideal world the odd smaller one dropping off ought to have damped out the oscillation.

The rapid cascade failure over a 5 second period remains unexplained. They should be able to reconstruct the domino effect of which plants went down when and why the grid was unable to isolate the weakness.

The report is essentially a whitewash to disguise just how incompetent the people who defined the network operating rules are. If they can determine that some generating sites failed to obey the rules and caused the massive systems failure then they should be named and prosecuted. Otherwise it looks like a smoke and mirrors job to hide the root cause.

If you skate on sufficiently thin ice like they did on that fateful Monday then you will fall through it.

That is partly due to machine translation out of the Spanish.

Long and short of it was they didn't have enough dynamic inertia in the system and when it reached high noon something had to give.

Icarus syndrome - quite literally!

In addition the network failed to protect itself from the abnormal state and so went completely dark rather than dropping off the main offenders. I suspect that the French interconnect dropping out was the coup de grace but without the official timeline being published that is a guess.

A graph of power, frequency and line voltage minute by minute over the relevant few hours would be *very* interesting to examine.

It is odd that they don't explain why it failed so spectacularly quickly. The final grid collapse took 5s and then it was all over.

The bits I quoted were from Guy Hedgecoe, a BBC correspondent.

The report was written by a committee of experts. Fifty, I think.

The committee studying the blackout is made up of representatives of the Ministry for Ecological Transition and the Demographic Challenge (MITECO), the Presidency of the Government, the Ministry of Defence and the Ministry of the Interior. Specifically, the Department of Homeland Security, the National Intelligence Centre, the General Staff and the National Centre for the Protection of Critical Infrastructure are involved.

formatting link
%B3n%20de
formatting link

The blackout, which occurred on 28 April 2025, affected the Iberian Peninsula, including Spain, Portugal and Andorra, and extended as far south as France. The power outage caused disruptions to essential services such as hospitals, airports and telecommunications networks. The causes of the blackout are being investigated by this committee.

Oh dear! Is English his first language?

Until they publish a detailed explanation of how it was that a predictable surge of power from solar PV at high noon was able to bring down the *entire* Spanish grid it looks like a white wash to me.

Also exactly what order the cascade failure occurred in (and name and prosecute the companies that they claim did not follow the rules). If that claim is true then they were culpable for the failure.

Comparable UK reports name all the players involved and exactly what happened at each site and when. See for example the report on our fairly spectacular summer failure in 2023 - this is a summary:

formatting link
NESO seem to have conveniently deleted the original National Grid technical report from their site :( Aha found it:

formatting link
And that is what a proper investigation report ought to look like!

I expect he's an arts or journalism graduate like most of the BBCs 'science experts'.

A phrase like " ...did not absorb all the voltage they were supposed to when tension was high" wasn't written by an expert.

As many as necessary. You probably can find their names if you are interested and seek it out.

...

Where does it say that was the cause? It happens every day.

That is for another stage.

You will have to wait. There is a procedure to follow.

The way I read it is that a relatively large number of relatively low power generators - presumably solar cell farms - were programmed to turn themselves off if the net voltage got higher than some preprogrammed limit.

They all seemed to have turned off at once which is presumably what pulled 3.3GW of generating capacity within thirty seconds.

Icarus died - but the Spanish network survived, as it was intended to do.

It just stopped delivering power for a couple of hours.

On the contrary, it did protect itself from the abnormal state, but at the considerable cost of a couple of hours of blackout.

The speed is perfectly explicable. If you have lots of identical controllers, all designed to turn themselves off when they see a particular situation, they are all going to turn off at once.

A more intelligent design might have delayed the turn-off by a short, randomly selected delay, so that the excessive voltage might have gone down slowly enough that the impeding turn-off could have been cancelled in the slower reacting controllers before it got put into effect.

Adding grid-battery based fast-reacting controller to the system would presumably have worked rather better.

formatting link
does seem to have been used in exactly that way from when it was first installed at the end of 2017. From 2022 it provided about 2000 MW of inertial response to the grid.

Logically. If the voltage is too high, presumably there is excess generation. Inverters get disconnected, they risk fire.

10 hours :-)

Possibly.

A huge solar plant is being named. Well, its name has leaked.

formatting link
+++------------------

*The photovoltaic plant at the origin of the blackout is Iberdrola's Núñez de Balboa mega-plant.*

As confirmed by elDiario.es, it was this plant which, half an hour before the outage, when it was generating 250 MW, began to produce anomalous oscillations which Red Eléctrica has asked to investigate and attributes to ‘a malfunction of an internal control’ or ‘an internal anomaly (...) to be clarified by the owner’ - Red Eléctrica places the start of the blackout in the ‘malfunction’ of a photovoltaic plant in Badajoz

The photovoltaic plant in the province of Badajoz that triggered the historic blackout on 28 April, when it caused a series of anomalous oscillations in the grid, is Iberdrola's Núñez de Balboa mega-plant. This was confirmed to elDiario.es by several sources familiar with the confidential reports of the Government's commission of experts and the system operator, Red Eléctrica, which asked to investigate the ‘malfunctioning’ of this installation, one of the largest solar parks in the country.

The government has concluded, after 49 days of investigation, that the Iberian blackout was a ‘multifactorial’ event without a single cause that would explain a combination of factors: insufficient capacity in the system to regulate voltage as expected, failures in REE's programming (which the company denies), malfunctioning of the voltage control systems of generation facilities and plants that were disconnected ‘improperly’.

It was, according to the governmental opinion, ‘a combination of conditions’ that led to ‘a chain reaction of overvoltage, with no single fault having been identified that could alone explain the outage’.

This ‘chain reaction’ started, according to REE, half an hour before the blackout. Until midday on Monday ‘nothing could have foreshadowed or even remotely predicted the events that occurred’, according to the system operator. But at 12:03, an anomalous oscillation reduced the voltage in the system and forced urgent measures to be taken.

As REE's Director of Operations, Concha Sánchez, explained at a press conference on Wednesday, this ‘very significant’ fluctuation lasted almost five minutes and required “immediate” action as it was a ‘dangerous’ situation: the way in which the interconnection with France operates had to be changed, as it stopped operating on alternating current and switched to fixed set-point, and the grid meshing was increased, which complicated voltage control.

The origin is in what the report released Wednesday by REE calls ‘Photovoltaic Plant A’, which according to sources consulted by elDiario.es corresponds to the Núñez de Balboa plant. At that time, the facility generated about 250 megawatts (MW), according to the REE report. The Government's report (in its confidential version, instead of the one published with numerous crossings out and the names of plants and companies erased, as the electricity companies had demanded), points to ‘anomalous oscillatory behaviour in the output of active and reactive power’ of this Iberdrola plant.

"In a few seconds, the plant's generation oscillates with a peak-to-peak amplitude of around 70% of the output it had immediately before the oscillation. This behaviour contrasts with that of other plants of the same technology connected at the same node or nearby nodes," says the document published by the government on Tuesday night.

According to the report, this oscillation is ‘more typical of synchronous technologies’, such as nuclear or gas, which ‘modify their power factor to maintain a constant voltage’, than of a photovoltaic plant, ‘which is subject to a fixed power factor’ and in which ‘the output power value, especially the active power, should be constant’.

According to the committee's opinion, "during this disturbance there are strong voltage oscillations, not only in frequency and power, mainly in the south and west of the Iberian Peninsula. Unlike previous voltage fluctuations detected on the same morning or on previous days, in this case there are repetitive oscillations of voltage rise and fall in the space of seconds, which follow a specific pattern coinciding with the oscillation in frequency, in the form of a seesaw".

‘During this period, some calls are reported by agents to the System Operator about the oscillations’ and ‘a sudden drop in the damping of the system is detected’, which ‘becomes more vulnerable’. The same oscillation is reproduced at 12.16 pm. One minute earlier, the Núñez de Balboa plant had ‘changed its production’ from the aforementioned 250 MW to 350 MW.

According to the REE report, ‘no fluctuations were observed in the plant's active power’, but ‘in reactive power’, which is needed to operate the electricity grids. This second oscillation of Núñez de Balboa comes shortly before another less atypical one originating in the centre of Europe at 12.19 pm, a prelude to the succession of overvoltages that will begin at 12.22 pm, which the system will not be able to absorb and will end up leading to the blackout.

REE points to a malfunction at Núñez de Balboa as an explanation for this anomalous behaviour: ‘The grid conditions at the connection point, short-circuit power and voltage level were analysed, and both were correct, so it is likely that the oscillation was caused by a malfunction of an internal control or by an internal anomaly of the plant, which should be clarified by the owner of the plant’.

‘The other plant that evacuates to the transmission grid through the same link installation as well as others that evacuate in nearby substations has been reviewed, and the only one that oscillated was the one indicated,’ says the system operator's report published on Wednesday.

The document, which REE is obliged to publish by regulation, given the seriousness of the blackout, calls for an ‘investigation into the cause of the appearance of the forced oscillation originating in the photovoltaic plant in the province of Badajoz and to implement corrective actions to avoid its repetition’.

"Before, during and after

When asked by elDiario.es, Iberdrola does not comment on this matter. On Wednesday, sources from the electricity company told Europa Press that its behaviour was ‘impeccable’, in contrast to the ‘reckless and negligent’ management of REE, and expressed their “astonishment” at the statements made by those responsible for Redeia, ‘who seem to confuse the consequences of the blackout with its causes’.

While the groundwork is being prepared to determine who is responsible for the blackout, with a view to the millions in compensation that will have to be paid to those affected in the future, Iberdrola has been pointing the finger at REE, as the electricity system operator, as being responsible for the incident for weeks.

Its executive chairman, Ignacio Sánchez Galán, said a few weeks ago that ‘Iberdrola's actions before, during and after the incident always responded to the protocols and regulations established by the competent ministry and by the system operator, which is Red Eléctrica, which is ultimately responsible for keeping the lights on in the country’. The day before, the CEO of Iberdrola España, Mario Ruiz-Tagle, stressed that ‘the responsibility for controlling overvoltages lies with Red Eléctrica’.

The malfunctioning of Núñez de Balboa is not the only cause of the blackout, but it is the beginning of the events that led to this unprecedented Iberian zero, according to REE, which fixes its origin in the previous half hour.

But the vice-president and minister for Ecological Transition, Sara Aagesen, pointed on Tuesday to ‘poor planning’ on the eve of the blackout by REE in the reserve power (gas and nuclear) in the so-called technical restrictions market, which the company denies: the planned power was at annual minimums, and also a plant was declared unavailable and was not replaced.

The government has also pointed out (this analysis is shared by REE) that this reserve market did not work as it should: the three nuclear reactors and the six combined cycle gas plants that were supposed to operate under technical restrictions (a mechanism with which electricity companies pocket billions every year) ‘were not regulating voltage’ as they should when these surges began. One gas plant in southern Spain stands out as doing the opposite of what it should have done: it injected reactive power instead of absorbing it.

According to REE's Director of Operations, if these plants had done their job by controlling the voltage, ‘we would not have had a blackout’. ‘The incident would have been avoided,’ said the non-executive president of REE, Beatriz Corredor. The former socialist minister insists on denying any responsibility for the company and rules out resigning.

The third cause of the blackout, according to the government's report, is an ‘undue’ disconnection of installations: a ‘cascading tripping of renewable generation plants’, says REE, which does not identify which ones because the companies in the sector have asked to anonymise all the information that affects them. REE has agreed to publish the information that affects it.

It is likely that this information will emerge with the report being prepared by the sector regulator, the National Markets and Competition Commission (CNMC).

In the background of the blackout is also the lack of mechanisms to allow renewables to regulate voltage. This possibility is included in an operating procedure that is already 25 years old. Its update, as the REE report reminds us, ‘has been pending approval since 2021’ by the CNMC.

The experts' report urges it to be implemented now. So does REE. In its report it calls for it ‘so that all generation that has the capacity to control voltage in real time must activate this control and also establish penalties for possible non-compliance’. A few weeks ago, when elDiario.es revealed that Competition had been analysing it for years, the CNMC assured that it would probably approve this new service in May. So far it has not done so.

Haphazard existence

Spain's largest electricity company owns just over 25% of Spain's installed capacity, some 31,800 MW. In 2020 it inaugurated the huge Núñez de Balboa photovoltaic plant in Usagre (Badajoz). With a capacity of 500 MW and the only Iberdrola facility in that province, it was presented in 2019 as the largest photovoltaic plant in Europe, with the capacity to supply energy to 250,000 homes. In 2022, it was surpassed as the largest on the continent by another Iberdrola mega-plant in Cáceres, the Francisco Pizarro (590 MW).

La Núñez de Balboa has had an eventful existence. The Supreme Court has yet to confirm the ruling that three years ago the High Court of Justice of Extremadura (TSJE) annulled the expropriation of the 525 hectares it occupies. Last summer, the European Public Prosecutor's Office opened an investigation into the 145 million euro loan granted to the plant by the European Investment Bank (EIB). Emma Navarro, now a director of Iberdrola Spain, was vice-president of the EIB until 2020.

At the end of last year, Antonio Luna, former mayor of Usagre, was acquitted of an alleged crime of administrative malfeasance linked to the building permit for the facility.

------------------++-

That procedure appears to be prevaricate and obfuscate.

I expect some randomly chosen scapegoat will be blamed rather than a system which manifestly was intrinsically vulnerable to such a failure.

Politicians will invariably blame the scientists and engineers when their policies cause such a mess - that is how these things play out.

That is the sort of detail that should be in the report and isn't.

Now we are getting somewhere... Thank heavens for unauthorised leaks in corrupt political administrations.

It was only multifactorial in the sense that the way the Spanish grid was designed and managed a single installation of 250MW misbehaving could bring the whole thing tumbling down.

That is down to bad engineering pure and not so simple to fix.

I suspect the distribution of electricity production and consumption in Spain also played a part much like in the shorter and better contained UK power fail. It upset all those living in the consumer zones of London and the SE but left those in the electricity producer zones untouched.

As Christine Keeler so aptly put it "they would say that wouldn't they".

"stopped operating on AC" does that mean it can switch to DC operation to allow Spain to freewheel its grid frequency?

If it was operating in "DC mode" why did it disconnect?

How grid meshing being increased complicates voltage control needs explaining. It looks a lot like technobabble word salad to me.

It sounds a lot like some sort of latent instability in the control system software led to it going crazy and chasing its own tail.

Is that a triangle wave in more scientific language?

Did some of the classical turbine generator systems drop off grid prematurely to save themselves from the frequency going out of bounds? That could partially explain the loss of damping (or was there almost no spinning reserve making power at the peak of solar PV output).

The fluctuation "originating" in the "centre of Europe" sounds more like a reaction to Spain injecting fluctuations into the continental grid.

Power plants do malfunction from time to time. They are supposed to leave gracefully when that happens - not bring down the whole grid!

Indeed. But it is unlikely to happen or have anything done about it.

It will become a finger pointing game and only the fat slimly lawyers defending their clients will win in the end. Decade long legal battle...

They have had enough warnings that something like this would happen if they cut their spinning reserves right to the bone.

It must also surely be the responsibility of *all* the generating systems not to continue to push full power into an already over voltage and over frequency grid.

That is the influence of bean counters. Spinning reserves cost money.

If that is true then they should be prosecuted for it. They helped to bring down the grid. It doesn't bode well when the investigators have their hands tied by government and the energy companies to anonymise who was guilty of what! Better to pretend it was multifactorial and completely unforeseeable than try to find and fix the actual root cause.

Why am I not surprised?

It wasn't undue if they were left holding the baby and the grid was in catastrophic collapse. Serious damage can result to their output stages.

The sector regulator seems to have totally failed to regulate.

Perhaps now they might pull their finger out and do it. Don't hold your breath.

"Spinning reserve" is just stored energy. As the South Australian Hornsdale Reserve has been demonstrating since 2017, a grid scale battery stores quite enough energy to do the same job, if connected to the grid by properly programmed inverters.

formatting link
Since 2022 they've been calling it "grid inertia", probably because it make it easier to explain to politicians.

It looks as if some of the generating systems discharged their responsibilities by simply turning themselves off.

<snip>

And providing "grid inertia" with a grid scale battery does seem to be a cheap alternative to rotating lumps of metal in turbines and generators.

The Australian example might get drawn to their attention, but I doubt it.

And maybe it is. The actual report is many pages, not what the press published.

...

This is not corruption. Secrets can not be maintained from the press when there are hundreds of people having the data.

...

I'm not clear in their actual meaning.

...

Yes.

Which is impossible if the connection was DC. So it can not be DC but some other meaning.

...

Notice that Iberdrola has generation of all kinds, from ancient turbines to state of the art solar.

...

The names are not published now, they will be named later, at another stage.

...

Indeed, that report includes a detailed timeline of the grid collapse caused by the near simultaneous failure of the Hornsea wind turbine farm due to improper control settings (-737 MW) and the Little Barford Combined Cycle Gas Turbine plant caused by EMI on a tach signal tripping the steam turbine (-244 MW) and a steam bypass valve failure tripping both gas turbines (-387 MW), both of these events triggered by grid voltage transients from the lightning induced phase to ground fault.

The wind farm failure was interesting, from the report:

"The wind turbine settings were standard settings from the manufacturer. During the incident, the turbine controllers reacted incorrectly due to an insufficiently damped electrical resonance in the sub-synchronous frequency range, so that the local Hornsea voltage dropped and the turbines shut themselves down.

Orsted have since updated the control system software for the wind turbines and have observed that the behaviour of the turbines now demonstrates a stable control system that will withstand any future events in line with Grid Code and CUSC requirements."

(IOW they finally called the wind turbine manufacturer and got the optimal control settings, as they should have done before powering up for the first time.)

Note that the waste heat recovery boilers on 387 MW of gas turbines at Little Barford produced 244 MW steam turbine power, a nice indication of just how inefficient gas turbines are unless used in a combined cycle configuration.

Solar clearly played no significant role, operating exactly as designed with the possible minor exception of 200 MW reportedly tripping at 49 Hz rather than 48.8 Hz. If true the utilities screwed up letting 200 MW of inverters connect to the grid with incorrect protective relay settings, but 200 MW was not enough to prevent the ~1 GW load dump.

The utilities learned from this event and have/are taking corrective action without input from any politician, as usual.

Glen