The detail that jumped out at me first: the three feed-in limits are not equal. Inv 1 is capped at 1000 W, Inv 2 at 1500 W, and Inv 3 is allowed up to 3500 W. That uneven split is the heart of this whole experiment in asymmetrical phase feed-in with the Victron Multi RS 48/6000.



Here is the problem being tackled. Local grid rules force an inverter to disconnect when any phase goes above 254 V, and that normally halts feed-in on all three phases even when the other two are well within limits. The setup pairs three single-phase Victron inverters with a Cerbo GX for independent per-phase control, so each of L1, L2 and L3 can be handled on its own. A software solution still under development connects to the inverter, measures grid voltage in real time, and adjusts power injection on each phase to try to balance them. The result shown is export being throttled or stopped on selected phases while the remaining phases keep exporting surplus power.



On the bench there is a blue Multi RS Solar unit, a blue Cerbo GX, lithium battery modules and hand tools, with a laptop running the custom software through external servers. The Cerbo GX runs software built on Node-RED, and VictronConnect plus the VRM dashboard appear in a screen recording. The battery sat at 100 percent, and AC loads ranged roughly from 2200 W to 2800 W during the run.



The limits are set by changing the Maximum feed-in parameter in the grid settings menu, with a distinct value for each inverter. One open question: whether this method also works on the Multiplus 2 has not been answered yet.



Project by The CSTech. Watch it on their YouTube channel:

formatting link


The uneven limit split is the choice I keep coming back to. Since any phase over 254 V forces everything off, giving each inverter its own ceiling means one problem line no longer drags the other two down, and that seems like the clever part. The trade-off I see is that those fixed numbers have to be picked carefully, because a ceiling set too low would hold a phase back unnecessarily.

Question for the maker: the laptop runs the custom software through external servers, while the Cerbo GX itself runs the Node-RED based software. How do those two sides talk to each other, and does the per-phase throttling happen locally on the Cerbo GX or out on the servers? I am trying to picture whether the system keeps working if the internet connection drops mid-feed.

A variation worth trying: instead of three fixed Maximum feed-in values entered once in the grid settings menu, have the software retune those limits continuously from the real-time voltage readings it already takes. If the phase balance shifts during the day, the caps could follow it, and every phase would stay as far under the 254 V disconnect point as possible while still exporting.