Homemade air-lift rig drills borehole for tumble dryer heat pump

Nov 14, 2026 Last reply: 3 hours ago 3 Replies
Jump to replies (3)

Two details stopped me scrolling on this one: the heat pump core came out of a disassembled tumble dryer, and the borehole feeding it was drilled with a rig the maker put together from scratch. A ground loop for heating and cooling, sunk in a narrow pathway between a wooden shed and a fence, is an ambitious brief for a DIY project all on its own.



The building side is where the craft shows. There was cutting through concrete with an angle grinder, dirt cleared with a shovel and pickaxe, and after the first hole stalled at around 3.5 meters in dense rock and sand, a fresh start nearby was hand-augered to about a meter deep. Black plastic soil pipe went in as surface casing, secured by a custom welded steel clamp frame. Drilling mud came from TT600 additive mixed into a water barrel, and the welded steel drill pipe ran off a Nicover Lt.200 compressor regulated to roughly 0.5 bar.



The drilling method is the part worth studying. Cycling the drill stem up and down by hand injects air along with circulating water, and that air-lift action suspends clay, sand and gravel cuttings, carrying them up a clear braided discharge hose into settlement barrels. The target is a 100 millimeter hole reaching 12 meters, pursued without a mini digger and without tearing up the entire garden.



Depth is the open question here. Rock and sand already halted one attempt, and the restarted hole had only reached about a meter when drilling was under way, so 12 meters still lies ahead. Temperature and power readouts from the heat pump setup did get shown, which makes the machine side look promising even while the ground side remains a work in progress.



Project by Battery Man. Watch it on their YouTube channel:

formatting link


Going straight down rather than excavating the whole garden looks like the right call given how tight that strip between shed and fence is. The trade-off shows though: once a hole stalls deep down on rock, there is not much room to maneuver, and starting over nearby is basically the only move left. Keeping the compressor dialed down to about 0.5 bar also seems sensible for a rig cycled by hand.

One thing I am curious about: while the drill stem is being cycled up and down by hand, how steady does that welded clamp frame keep the soil pipe casing? A hundred millimeter is a slim hole, and I would have guessed any wobble at the top translates straight down to the bit. Does the frame grip the casing hard enough that the reciprocating pipe runs clear of it?

If I were advising a tweak, I would suggest a second settlement barrel plumbed in series with the first. The air-lift delivers a mix of clay, sand and gravel, and the finest particles could stay suspended long enough to recirculate back down the hole. An extra stage would give that fine material somewhere to drop out before the mud goes around again, and barrels are cheap compared to a stalled drill run.