Got the whole exterior switched on tonight, two days into November. First year I've ever been done this early. usally I'm out there in the cold around Thanksgiving weekend fighting with strands that half died in the garage, so this feels like a small victory. The big lighted arch over the front walk went up first, then the wireframe trees and the reindeer along the lawn, and my wife talked me into adding a sleigh with Santa this year since she found one at a yard sale over the summer for next to nothing. Warm white on the roofline and porch columns, multicolor everywhere else, plus a couple of lighted snowmen by the steps and a wreath over the garage. The trick this time was testing every strand on the porch before it went up instead of after. Found three dead sections that way and saved myself a ladder trip in the dark. Everything's on a timer now so it kicks on at dusk and shuts off around 11, which the neighbors will hopefully appreciate. Inside is half decorated, tree goes up this weekend. Two months of enjoying it instead of two weeks of panicking feels pretty good.
Outside finally lit up on Nov 1, earliest I've ever managed
Nov 03, 2026
Last reply: 1 day ago
3 Replies
Congrats on beating the cold, that early finish is the dream. I managed somthing similar last year after years of doing the whole thing in December wind. Bought a big plastic bin just for exterior stuff and labeled every strand with masking tape saying where it goes, so this fall it was maybe two hours total instead of a full Saturday. The taped strands are honestly the best thing I've done for this hobby. Testing on the ground before the ladder is the move. I learned that the hard way when I had a strand up over the bay window that turned out to be dead in the middle, and taking it down in January ice was miserable. Now I string everything across the lawn first and let it run a few minutes while I drink coffee. One thing I do differently is skip the multicolor outside and go all warm white, just personal taste, my wife calls it boring but the roofline looks clean. Also worth checking your timer around the solstice since dusk shifts earlier, mine kept kicking on at 4:30 in mid December and the neighbors probly thougth I never slept. Inside is still a disaster over here though, the tree box is sitting in the hallway and has been for a week.
I do the opposite on timing, sort of. Everything gets repaired and tested in the garage thru November, but nothing goes on the house til the second weekend of December. My wife sets that rule after one year when we had icicles hanging off the eaves for six weeks and she got sick of looking at half-lit reindeer by December 10th. So the November work happens inside where it's warm, on the workbench, replacing burned-out bulbs and untangling the spaghetti. Last year I found a whole box of C9s where the squirrels had chewed the cord on the roofline strand, which I would never have spotted at night on a ladder. The upside is the install itself is quick, maybe three hours, and everything allready works. The downside is I miss that two months of enjoyment you've got going. Our street has a couple of houses that light up early and honestly by mid-November I'm glad someone on the block has it going. Your neighbors are probably the same.
That idea of taping every strand and binning it up is perfect for preventing total chaos. I had a similar setup last year and I always do the same thing when testing the porch lights. Instead of just looking for a dead spot, I flick every single one on and off quickly while it's still warm. It helps me catch if a bulb is flickering or if it's just a weak internal connection, wich is way harder to see when you're just staring at the light. Also, your point about checking the timer around the solstice is relly smart; the shift in dusk time is a killer.
Join the Discussion
Have something to add? Share your thoughts — no account required.
Didn't find your answer?
Ask the community — no account required