sdram modeling

Hi there

I am using a Micron verilog behavioaral mdoel for SDRAM MT48LC16M16A2 which is rated for CL=2 and I want to adapt the timings to verify a Mobile RAM which provides timings (tCK3, tAC3 etc.) for CL=3. How can I do it safely?

Thanks in advance to who'll reply

task set__timing; begin // Special timing for -75, CAS Latency = 3, tAC = 7.4ns! tAC = 7.4; tCK2 = 7.5; // tCK for CL=2 tHZ = 5.4; tOH = 3.0; tOH2 = 1.8; // Just enough... tMRD = 2.0; // 2 Clk Cycles tRAS = 45.0; tRC = 65.0; tRCD = 20.0; tRFC = 66.0; tRP = 20.0; tRRD = 15.0; tWRa = 7.0; // A2 Version - Auto precharge mode (1 Clk + 7 ns) tWRp = 14.0; // A2 Version - Manual precharge mode (14 ns) end endtask

Reply to
Andy Luotto
Loading thread data ...

ElectronDepot website is not affiliated with any of the manufacturers or service providers discussed here. All logos and trade names are the property of their respective owners.