GOF, Gates On the Fly, GUI tool to do netlist trace and modification(ECO). New Release of GOF V2.097 with features
- Integrate a parser for Synopsys Primetime Timing Report file.
- Detect bottlenecks from timing report file.
- Import related violated paths into Partial Schematic.
- Visually isolating bottleneck on the schematic.
- Users can control to draw schematic of violated paths by defining Start-Point, Through-Point and End-Point.
- Wild card support to match Start/Through/End points.
- Interactive with build-in ECO engine to fix the violated paths. Check Timing ECO example formatting linkNandyformatting linkNetlist Debug/ECO in GUI mode.